CSU San Marcos
Design Build Contract
Replacement of 1400 lineal feet of heating hot water hydronic piping
Routing ran from the campus central plant to a utility tunnel located beneath a main access road and student parking
Work commenced adjacent to an existing pedestrian sidewalk requiring critical aspects of pedestrian safety and traffic control
System was installed in a concrete utilidor providing access points along the pipeline via concrete lids to increase the accessibility to the pipeline for maintenance and monitoring purposes